Brixel is your

bathroom specialist tile expert waterproofing pro kitchen remodeler general contractor basement legalizer project manager flooring installer plumber electrician permit facilitator designer builder

Bathroom renovation that lasts
with waterproofing you can trust.

From complete remodels to leak repairs, every bathroom we build is backed by a lifetime waterproofing warranty.

Our signature guarantee

A written lifetime warranty
on every bathroom we waterproof.

Our proprietary waterproofing system comes with a written lifetime warranty — and we've rescued dozens of failed jobs from contractors who couldn't offer one.

Bathroom waterproofing membrane installation
Condo Bathroom Renovation

Custom Tile Work

Perfectly aligned porcelain and ceramic — zero lippage, clean grout lines, built to last decades.

Custom Tile Work detail
Primary Ensuite Renovation

Walk-In Shower

Frameless glass enclosures with rainfall showerheads, bench seating, and precision drainage.

Walk-In Shower detail

Heated Floors

Radiant in-floor heating beneath natural stone or porcelain for year-round comfort.

Heated Floors detail
Accessible Bathroom Design

Barrier-Free Entry

Curbless shower designs with proper slope and drainage for full wheelchair accessibility.

Barrier-Free Entry detail

Grab Bars & Safety

Code-compliant safety features integrated seamlessly into the design — functional without looking institutional.

Grab Bars & Safety detail

Your sanctuary, reimagined from the tile up.

Condo bathroom renovation

We've completed 50+ condo bathroom renovations across the GTA — on time and damage-free.

Condo renovations require specialized knowledge of building rules, noise bylaws, and structural limitations. We handle all condo board approvals and protect surrounding units throughout the process.

Fast bathroom renovation timeline

Our 2–3 week bathroom timeline means less disruption to your daily life.

We've streamlined our process without cutting corners. Materials are pre-ordered, trades are pre-scheduled, and every step is planned before we swing a hammer.

Kitchens designed for how
you actually live.

From layout redesigns to custom cabinetry — we build kitchens that work as beautifully as they look.

Custom kitchen island

Kitchen Island

Custom islands with integrated storage, seating, and prep space — the centerpiece of modern open-plan living.

Custom kitchen cabinetry

Custom Cabinetry

Soft-close hardware, pull-out organizers, and finishes tailored to your style and storage needs.

Quartz kitchen countertops

Quartz Countertops

Durable, non-porous surfaces that resist stains and scratches — ideal for busy family kitchens.

Premium kitchen backsplash

Premium Backsplash

From classic subway tile to custom mosaic designs — handcrafted installations with precision cuts and clean grout lines.

Under-cabinet LED task lighting

Under-Cabinet Lighting

LED task lighting that illuminates work surfaces while adding warmth and ambiance to the space.

The heart of your home deserves the best.

In-house trade coordination

We coordinate all trades in-house — plumbing, electrical, HVAC — so you're never juggling contractors.

Kitchen renovations touch every system in your home. Our single-team approach means one point of contact, one schedule, and zero miscommunication between trades.

Kitchen functioning during renovation

Many clients keep a functioning kitchen setup while we work — we plan around your life.

We work in phases to minimize downtime. Temporary sink setups, appliance access, and careful scheduling mean you're never left without a way to feed your family.

Transform your entire home
without the chaos.

From 1970s layouts to modern open-concept living — we coordinate every trade in-house, so you deal with one team, one schedule, and zero surprises.

Living Spaces

Renovated open living space
Open-concept layout

Open-Concept Layout

Removing walls and reimagining flow to create bright, connected living spaces that suit modern family life.

Custom millwork and trim

Custom Millwork

Crown moulding, wainscoting, built-in shelving, and trim work that adds character and value to every room.

Flooring & Stairs

Hardwood flooring and staircase
Hardwood flooring

Hardwood Flooring

Solid and engineered hardwood installation with precision fitting, seamless transitions, and professional finishing.

Renovated staircase

Stair Renovation

Carpet removal, hardwood refinishing, modern railings, and complete stair rebuilds that transform your entryway.

Interior Updates

Updated home interior
Modern lighting design

Modern Lighting

Recessed pot lights, pendant fixtures, dimmer controls, and strategic lighting design that sets the right mood.

Drywall and paint finishing

Drywall & Paint

Smooth finishes, repair work, and fresh coats with premium paints — the details that pull an entire renovation together.

From outdated to outstanding every detail matters.

Toronto home reimagined

We've helped Toronto families reimagine their homes — from 1980s layouts to modern open-concept living.

Whether it's a dated split-level or a cramped bungalow, we see the potential in every home. Our design process starts with how you live and works backward to create spaces that feel natural and functional.

Daily progress updates

Daily progress photos and real-time updates — so you always know exactly where your project stands.

No more wondering what happened today. You'll receive photo updates, milestone reports, and a clear timeline that keeps you informed from demolition to final walkthrough.

Legal basements,
done right the first time.

From egress windows and permits to full rental suites — every basement we build is fully permitted, code-compliant, and built to pass inspection.

  1. 01

    Assessment & feasibility

    We measure ceiling height, review the existing structure and drainage, and confirm what the City will actually approve — before you spend anything on drawings.

    Basement assessed for legal conversion
  2. 02

    Drawings & City of Toronto permits

    We prepare the drawings and file the application. Approval typically takes 4–8 weeks — we manage submissions, revisions, and inspector scheduling throughout.

    Basement permit drawings
  3. 03

    Egress windows & separate entrance

    Code-required emergency exits with properly sized window wells, plus a private exterior entrance with proper grading and drainage — the two items that make a basement both legal and rentable.

    Egress window with window well
  4. 04

    Moisture control & waterproofing

    Interior drainage systems, vapor barriers, and sump pump installation — done before finishing, so it never has to be torn out and redone.

    Basement moisture control and drainage
  5. 05

    Kitchen, bath & final inspection

    Complete 3-piece bathrooms and kitchenettes with separate plumbing and electrical, then final inspection and your certificate of completion.

    Basement suite kitchen and bathroom

A legal basement adds $150K+ to your home's value.

Basement built like the rest of your home

Built like the rest of your home — not like a basement.

Full-height ceilings, proper soundproofing, matched flooring, and finished trim work. Your basement should feel like an extension of your home, not an afterthought.

Permit handling process

We handle everything — from City of Toronto permits to final inspection and certificate of completion.

The permit process can take 4–8 weeks with the City. We manage every step — drawings, applications, inspector scheduling, and required upgrades — so you don't have to.

Your vision, our execution
— delivered on time and on budget.

End-to-end construction management for designers, architects, and contractors who need a reliable build partner.

Design Execution

We take your designer's specifications and bring them to life with precision — every material, finish, and detail exactly as envisioned.

Trade Coordination

Scheduling and managing every subcontractor — tilers, plumbers, electricians, painters — so the designer can focus on design.

Budget Tracking

Transparent cost reporting with real-time budget updates — no surprises, no overruns, no hidden line items.

Timeline Management

Detailed project scheduling with milestone tracking, daily reporting, and proactive problem-solving to keep builds on track.

One team, one standard from start to finish.

Designer and architect partnership

Interior designers and architects trust us to execute their vision without the headaches of managing trades.

You design it, we build it. Our project managers become an extension of your team — handling the construction complexity so you can focus on your clients and your craft.

Daily progress reporting

Daily progress reporting and real-time project updates keep everyone aligned and accountable.

Every stakeholder gets visibility into project status, budget tracking, and timeline progress. No more chasing contractors for updates or wondering what happened on site today.

What's included
in every Brixel project.

Fixed-price quotes with no hidden fees

Detailed line-item breakdowns

Change order process clearly documented

Payment schedule tied to milestones

Premium fixtures from trusted suppliers

Waterproofing with lifetime warranty

Code-compliant construction materials

Samples and selections before we start

Daily cleanup after every work session

Dust barriers and floor protection

Respectful work hours (8am–6pm weekdays)

Dedicated debris removal

Dedicated project manager for every job

Daily progress photos and updates

Clear timeline with milestone tracking

Direct phone and email access

Written warranty on all workmanship

Lifetime waterproofing guarantee

Post-project follow-up inspection

Responsive service for any concerns

We handle all permit applications

Ontario Building Code compliance

All required inspections scheduled

Certificate of completion provided

Realistic schedules set before we start

Bathroom renovations in 2–3 weeks

Phased work to minimize disruption

Proactive delay prevention

Fully licensed and insured (WSIB)

Liability coverage on every project

Safe work practices on every site

Protection for your property throughout

Ready to get started? Let's talk about your project.